hotline
Products
All categories
Contact us
左側聯系方式
Time of issue:2020-10-27 11:21:58
Shandong Huayuan Boiler Co., Ltd.
General Manager: Zhang Yuxiang
Phone: +86-539-7673517
Mobile: +8618853908166
Vice President of Sales: Qiao Chunlei
Phone: +86-539-7673821
Mobile phone: +8618660980650 (the same number on WeChat)
Sales Office
Phone: +86-539-7673556
Fax: +86-539-8164060
Factory Affairs Office
Phone: +86-539-8162423 / +86-539-7673500
Phone: +86-539-8162151
Fax: +86-539-7673511
E-mail: 0539glc@163.com
Company address: No. 55, Yongan Road, Zaoyuan Town, Lanshan District, Linyi City, Shandong Province
Installation site of circulating fluidized bed coal-fired coal slurry boiler
Retail price
0.0
Yuan
Market price
0.0
Yuan
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
1
Product description
Parameters
The boiler is a single-tube horizontal type, forced circulation water pipe circulating fluidized bed boiler, which adopts a single furnace, forced circulation, suspension structure, and all steel frame π-type layout. The boiler is open above the operating floor, closed below the operating floor, and a concrete platform is set at the 8m elevation of the operating floor and 5.2m of the operating floor. The furnace adopts membrane water-cooled wall suspension structure, two high-temperature adiabatic cyclones are arranged at the furnace outlet, two-stage economizers are arranged in the tail shaft flue, and SCR denitrification installation positions are reserved between the two-stage economizers. Three sets of air preheaters for primary and secondary air are arranged below the economizer.
This boiler adopts advanced circulating fluidized bed combustion technology of Institute of Engineering Thermophysics, Chinese Academy of Sciences. This hot water boiler is used for large-scale centralized heating. The 4 sets of 70MW boilers in this project are mainly used for the heating project of the people's livelihood in Dongying District, Dongying City, which belongs to the large-scale heating project sponsored by Shandong Provincial Supervision and Dongying City.
1. Main design parameters
Rated thermal power 70MW
Rated water temperature 130 ℃
Rated outlet pressure (gauge pressure) 1.6 MPa
Rated return water temperature 70 ℃
Rated circulating water volume 1002t/h
Boiler exhaust temperature 132 ℃
Cold air temperature 20 ℃
Boiler design thermal efficiency 91.7%
Fuel consumption 16858kg/h
Primary hot air temperature 150 ℃
Secondary hot air temperature 150 ℃
First and second air volume ratio 50:50
Cycle magnification 30
Desulfurization efficiency (when the molar ratio of calcium to sulfur is 3) ≥ 93%
Scan the QR code to read on your phone
Online inquiry
Online inquiry